Home
About TAIDA
Products
Solutions
TAIDA Advantage
Successful Cases
Client Visits
Videos
News & Events
Service & Parts
Contact Us
全站
English
Bahasa Indonesia
自由容器
Waste-to-Energy &
Biomass Cranes
Engineered for waste bunker, fuel pit and boiler-feed
handling in waste-to-energy and biomass power
plants.
Waste & Fuel
Handling
Grab, mix and feed solid
waste or biomass efficiently
High-Duty
Crane Design
Built for frequent cycles
and continuous plant
operation
Semi / Full
Automation
Support manual, semi-a
utomatic or automatic c
ontrol
Corrosion &
Wear Protection
Matched to dusty, humid
and aggressive
environments
自由容器
Hot Waste-to-Energy &
Biomass Cranes
Two representative configurations for waste bunker
and biomass fuel handling.
10t Waste Bunker
Grab Crane
16t Biomass Fuel HandlingCrane
10t Waste Bunker
Grab Crane
Quick Details
·
Rated Capacity: 10t
·
Span: 28-34m
·
Lifting Height: 22-28m
·
Grab Volume: 6-8m³
·
Duty Class: A7-A8
·
Control: Cabin / remote / semi-auto
·
Main girdrers by bulk shipment
Packaging & Delivery
·
Grab and trolley protected separately
·
Electrical parts in export wooden cases
·
Manuals and drawings included
·
Project cargo or container solution
·
Site service by agreement
Applications
·
MSW bunker
·
Waste mixing
·
Boiler feed
·
RDF handling
·
Refuse pit charging
·
Waste receiving hall
自由容器
16t Biomass Fuel HandlingCrane
Quick Details
·
Rated Capacity: 16t
·
Span: 24-30m
·
Lifting Height: 18-24m
·
Grab Volume: 8-10m³
·
Duty Class: A7
·
Control: Cabin / remote / f
ull-auto optional
·
Steel structure project packed
Packaging & Delivery
·
Grab and hoist secured separately
·
Export protection for controls
·
Certificates and FAT records included
·
Ocean shipment supported
·
Installation guidance available
Applications
·
Wood chips
·
Biomass bunker
·
Fuel reclaim
·
Boiler house
·
CHP plant
·
Agricultural residue
自由容器
Custom Waste-to-Energy &
Biomass Cranes
Configured around plant process,pit geometry,grab
duty and automation requirements.
Plant Type &
Process
Waste-to-energy,biomass
CHP or RDF handling
Span & Bunker
Geometry
Match pit width, runway
and working coverage
Grab Type &
Volume
Select orange-peel or
clamshell grab by material
Duty &
Automation
Manual, semi-auto or
automatic cycle control
Environment &
Protection
Humidity, corrosion, dust
and wear protection
Power
&Monitoring
Control mode, anti-sway
and status monitoring
GET FREE WASTE HANDLING CHECK
Successful Cases
TAIDA GLOBAL Completed Export of Heavy Duty Crane Girder to Saudi Arabia
Heavy Duty Gantry Crane Manufacturing for Large-Scale Industrial Applications
Heavy Duty Gantry Crane for Efficient Industrial Material Handling
Heavy Duty Gantry Crane Manufacturing and Delivery for Industrial Applications
Batch of Longwall Hydraulic Roof Supports Delivered to Mexico
Batch of Longwall Hydraulic Roof Supports Delivered to India
自由容器
Waste-to-Energy & Biomass
Cranes FAQ
Quick answers for buyers selecting cranes for waste
bunker and biomass fuel handling.
1. What are Waste-to-Energy & Biomass Cranes?
Waste-to-Energy & Biomass Cranes are designed for
handling waste, biomass and other bulk fuels.
2. Where are they used?
Waste-to-Energy & Biomass Cranes are used in waste-to-
energy plants, biomass plants and fuel bunkers.
3. What materials can they handle?
Waste-to-Energy & Biomass Cranes can handle municipal
waste, wood chips, biomass and alternative fuels.
4. What capacities are available?
Waste-to-Energy & Biomass Cranes can be customized for
different capacities, spans and bunker layouts.
5. What grab types are available?
Waste-to-Energy & Biomass Cranes can use orange-peel,
clamshell or custom hydraulic grabs.
6. Can they operate automatically?
Yes. Waste-to-Energy & Biomass Cranes can support
automatic feeding, stacking and mixing cycles.
7. Can they handle continuous-duty operation?
Yes. Waste-to-Energy & Biomass Cranes can be designed
for frequent or continuous-duty material handling.
8. What safety features are included?
Waste-to-Energy & Biomass Cranes can include anti-
collision, overload protection, zoning and emergency
controls.
Get Free Crane Selection Check